The Basarab Overpass, that had a significant impact on the public and private viability in the Romanian capital, is characterized by the construction of two road bridges of which one cable-stayed bridge with a “light” of about 250 m (the larger of the two provided by the project) crossing over the Northern Railway Station tracks and one, the Grozavesti Bridge, that has an all-steel arch structure with a span of 120 m.
Cariboni group lighted up the project providing MATRIX professional floodlights.